Mesa College Drive, San Diego 2020-2023 36,000 square feet 5 story, Type VA over Type I Construction Evelyn's Place includes 58 studio apartments over parking, future TI space, leasing office, and utility spaces. My role as project manager / project architect for Evelyn's Place started with initial schematic design. At SDA we had a team of 3 designers develop the concept and design for the building. Throughout the process, tasks included project scheduling, budgeting, design team coordination, and shared consultant coordination with the job captain. The project is approved for the building permit, but has not started construction.
Architectural Permit Set
This document set is the result of a full team of SDA designers and not solely my own work.